Make these calendaring classes the same as in master.
I can't get the akonadi calendaring unit-tests to run on 4.11. (Is testrunner isolated tests only working on master?). The only way I'll continue bug-fixing in 4.11 is if the tests run, so, by making the code the same as in master, I can run be sure the code is correct as the test pass in master. These changes are only refactorings and such anyway.
parent
70d682cf
Please register or sign in to comment